contoh pembuatan RAB (RENCANA ANGGARAN BIAYA) SEDERHANA


RENCANA ANGGARAN BIAYA 
PENYEIMBANG BEBAN DAN PERBAIKAN BOX PANEL
  3 FASA DAYA 10.600 VA 
NO URAIAN SATUAN VOL HARGA SATUAN JML HARGA
1 NYM 3 X 2,5 MM ROLL            3 495,000 1,485,000
2 BREKER 80 AMPER 3 PASA PCS            1 875,000 875,000
3 KABEL DUK BTNG            2 35,000 70,000
4 VOLT METER 3 FASA PCS 1 115,000 115,000
5 PILOT LAMP PCS 3 250,000 750,000
6 SISIR 3 FASA BTNG 1 50,000 50,000
7 KABEL NYY 4X25 MM M 2 150,000 300,000
8 MCB BROCO 20 AMPER PCS 12 30,000 360,000
9 KABEL SCUND  + KARET 25 MM PCS 6 15,000 90,000
10 BASE BAR NETRAL DAN GRAUND PCS 2 50,000 100,000
11 SOLASI PCS 3 10,000 30,000
12 T DUS PCS 15 5,000 75,000
13 CLEM 10 MM PCS 5 5,000 25,000
14 BOX PANEL 60 X 80 PCS 1 800,000 800,000
15 ONGKOS PENYEIMBANGAN BEBAN DAN PERBAIKAN BOX PANEL 1 1,400,000 1,400,000
Jumlah 6,525,000
Terbilang :Lima juta tujuh ratus dua puluh lima rupiah
Cilacap, 27 Februari 2015
Hormat kami
Pelaksana
KARSIM